Contact|Ombudsman|Website Map|Extranet
Português
|
Español
SEARCH
:: Home>Our Business>Generation>Brazilian Hydroelectic Potential - SIPOT

Generation

veja também:

Mapa SIPOT fev_2012  [pdf - 16627 KB]

Potencial Hidreletrico Brasileiro por Bacia  [pdf - 36 KB]

Potencial Hidreletrico Brasileiro por Estagio - Dezembro 2011  [pdf - 38 KB]
Brazilian Hydroelectic Potential - SIPOTIsolated SystemsModelo de Simulação a Usinas Individualizadas (MSUI)

Brazilian Hydroelectic Potential - SIPOT

Eletrobras has developed the Brazilian Hydroelectric Potential Information System (SIPOT) with the purpose of storing and processing information on hydroelectric studies and projects. The development of hydroelectric studies, that is, the additional studies in inventory phases, feasibility and basic project enabled the identification of current economic, environmental and technical restrictions, which, most of the times, reduce the estimated potential. SIPOT is constantly updated with study information, when approved by Aneel and available to the public, or with information from Eletrobras companies or Ministry of Mines and Energy.

This work is managed by the Hydric and Inventory Resources Divisions (DENH), Department of Energy Studies (DEN), and Eletrobras Engineering Directory.

Page access count image
TOP

Sede: Av. Presidente Vargas, 409/13º andar, Centro
Rio de Janeiro, 20071-003 | Tel.: (21) 2514-5151

Copyright ® Eletrobras, 2010
 
AccessibilityCode of Ethics | Privacy Politics

Page access count image
Page access count image